Home / About
About Ironset Concrete
The Dallas-Fort Worth concrete crew that builds the slab from the dirt up - compacted sub-base, steel on chairs, and a 4,000 PSI pour finished by the same hands that set the forms.
One form crew, one rule: never pour it thin
Marcus Delgado started Ironset Concrete in 2008 with a single form crew and one rule he still holds today: the slab gets built from the dirt up, not the top down. After years of tearing out cheap flatwork that looked perfect on day one and spidered by year two, he was done pouring the way the low bid wanted it poured. So every Ironset job starts where the cracks actually start - grading and compacting the sub-base for the expansive North Texas clay, setting steel on chairs so it carries load in the middle of the slab, and placing a real 4,000 PSI mix even when a thinner spec would win the bid. Marcus still measures most slabs himself and runs the finishing crew on the pour, and in the years since, Ironset has placed over 9,400 yards of driveways, patios, and slabs across the Metroplex. The crew that sets your forms is the same crew that screeds, floats, and brooms the finish - which is exactly why every edge comes out dead straight and every pour carries a written ten-year warranty.
- Experienced Finishing Crews On Every Pour — Experienced, trained professionals who get the details right.
- Upfront Written Square-Foot Pricing — Clear, upfront pricing and straight answers — no surprises.
- Reliable Same-Week Project Starts — Dependable crews who show up on time and follow through, every job.
- Quality Workmanship Warrantied Ten Years — Careful, high-quality work we stand behind long after the job is done.
- Locally Owned Dallas Concrete Contractor — A local, family-minded team that treats your home like our own.
How we work
- 1
Free on-site measure
Marcus walks the slab, checks the grade and drainage, and hands you a written square-foot price the same day - no pressure to replace what only needs a resurface.
- 2
Sub-base prep and forms
We tear out the old slab, grade and compact the sub-base for the expansive clay, and set the forms dead level before any concrete is ordered.
- 3
Steel, then the pour
We lay steel on chairs so it carries load in the middle of the slab, then place a real 4,000 PSI mix and finish it - broom, stamped, or aggregate - by the same crew that set the forms.
- 4
Cut, cure, and walk it
We saw control joints by the foot so cracks follow our line, let it cure, haul off every form board, and walk the finished slab with you before we leave.